Teignbridge's motorists will have 17 road closures to avoid nearby on the National Highways network this week.
And one of them is expected to cause delays of between 10 minutes and half an hour.
The latest expected works list, with notes from National Highways, shows that 17 closures are due to start over the next two weeks:
• A38, from 7pm March 17 to 6am March 19, slight delays (under 10 minutes): A38 eastbound, Clay lane exit slip carriageway closure, for horticultural works, diversion via A38 to Chudleigh Station B3193.
• M5, from 8pm March 17 to 6am March 22, slight delays (under 10 minutes): M5 northbound, junction 31 to 30, lane closures for survey works.
• A38, from 8pm March 17 to 6am March 18, slight delays (under 10 minutes): A38 westbound, Drumbridges exit slip road closed for survey works, diversion via A38 westbound, exit at Linhay to return A38 eastbound to Drumbridges.
• A38, from 7pm March 18 to 6am March 19, slight delays (under 10 minutes): A38 westbound, Harcombe cross to Chudleigh, lane closure with convoy for carriageway repairs.
• A38, from 8pm March 18 to 6am March 19, slight delays (under 10 minutes): A38 eastbound, Goodstone exit slip road closed for survey works, diversion via A38 eastbound, exit at Drumbridges, A382 southbound, A383 westbound.
• A38, from 8pm to 11.59pm on March 18, slight delays (under 10 minutes): A38 eastbound, Dartbridge exit slip road lane closure and traffic signals for Devon County Council works.
• A38, from 8pm March 18 to 6am March 19, slight delays (under 10 minutes): A38 westbound, Dartbridge exit slip road closed for survey works, diversion via A38 westbound, exit at Lower Dean, B3380 eastbound to Dartbridge.
• A38, from 7pm March 19 to 6am March 27, moderate delays (10-30 minutes): A38 westbound, Drumbridges to Goodstone - carriageway closure for horticultural works, diversion via A382, Exeter road, Ashburton road and A383 to rejoin the A38.
• A38, from 8pm March 19 to 6am March 20, slight delays (under 10 minutes): A38 eastbound, Peartree to Goodstone - mobile lane closure including short closures of entry slip roads as mobile closure passes through for survey works.
• A38, from 8pm March 19 to 6am March 20, slight delays (under 10 minutes): A38 westbound, Dartbridge to Drybridge - mobile lane closure including short closures of entry slip roads as mobile closure passes through for survey works.
• A30, from 8pm March 19 to 4am March 20, slight delays (under 10 minutes): A30 westbound, Fingle Glen - lane closure for barrier/fence safety repairs.
• A38, from 7pm March 20 to 6am March 21, slight delays (under 10 minutes): A38 eastbound, Dartbridge to Ashburton lane closure for verge works.
• A38, from 7pm March 20 to 6am March 21, slight delays (under 10 minutes): A38 westbound, Clay lane entry slip and Drumbridges exit roads closed for resurfacing works, Clay Lane -diversion via Clay Lane, B3193 to Chudleigh and rejoin A38, Drumbridges - diversion via Linhay and return.
• A30, from 8pm March 20 to 6am March 22, slight delays (under 10 minutes): A30 eastbound, Fingle Glen exit slip road closed for horticulture works, diversion via A30 eastbound, exit at Alphington, Ide Lane, Pocombe Hill, Tedburn Lane, Five Mill Hill.
• A38, from 8pm March 27 to 6am March 29, slight delays (under 10 minutes): A38 westbound, Linhay exit slip road closed for horticultural works. Diversion via A38 westbound to Dartbridge and return to exit.
• A30, from 8pm March 27 to 6am March 28, slight delays (under 10 minutes): A30 eastbound, Fingle Glen entry slip road closed for electrical works. Diversion via Tedburn Road and Ide Lane to A30 Alphington junction.
National Highways is responsible for maintaining motorways and major A-roads, so closures of smaller roads will not be included in their schedule.