Drivers in and around Teignbridge will have 14 National Highways road closures to watch out for this week.

But motorists will be able to take some solace in the fact that all of them are only expected to cause slight delays, of under 10 minutes.

The latest expected works list, with notes from National Highways, shows that three closures already in place are expected to carry on this week:

A30, from 11pm November 6 to 6am November 7, slight delays (under 10 minutes): A30 westbound, Alphington junction, Exeter to Fingle Glen carriageway closure for resurfacing, diversion via Ide Lane, Tedburn Road and Five Mile Hill.

A30, from 7pm November 6 to 6am November 7, slight delays (under 10 minutes): A30 eastbound, Fingle Glen to Alphington junction, Exeter carriageway closure for resurfacing, diversion via Five Mile Hill, Tedburn Road and Ide Lane.

A30, from 6am October 25 2022 to 6am February 25 2023, slight delays (under 10 minutes): A30 eastbound, Alphington entry slip lane narrowing for resurfacing.

And a further 11 closures will begin over the next seven days:

A30, from 6am November 7 to 8pm December 14, slight delays (under 10 minutes): A30 both directions Fingle Glen to Alphington lane closures/contraflow and 50mph speed limit for resurfacing.

A38, from 8pm November 7 to 6am November 10, slight delays (under 10 minutes): A38 westbound, Chudleigh exit slip road closure for drainage works, diversion via A38 to Drumbridges and return.

A38, from 8pm November 7 to 6am November 12, slight delays (under 10 minutes): A38 eastbound, Chudleigh Knighton lane closure for drainage works.

A38, from 8pm November 8 to 4am November 9, slight delays (under 10 minutes): A38 westbound, Ashburton lane closure for barrier repairs.

A38, from 8pm November 8 to 5am November 9, slight delays (under 10 minutes): M5 both directions, junction 30 to 31 - lane closures for safety barrier repairs.

A38, from 8pm November 11 to 4am November 12, slight delays (under 10 minutes): A38 eastbound, Harcombe to Haldon Hill - lane closure for barrier/fence safety repairs.

A38, from 8pm November 14 to 4am November 15, slight delays (under 10 minutes): A38 eastbound, Drumbridges lane closure and entry slip narrow lanes for horticultural works.

A38, from 8pm November 15 to 4am November 16, slight delays (under 10 minutes): A38 eastbound, Haldon Hill lane closure for horticultural works.

A38, from 9.30am to 3.30pm on November 16, slight delays (under 10 minutes): A38 eastbound, Dart Bridge to Haldon Hill mobile lane closures for safety barrier inspections.

A38, from 9.30am to 3.30pm on November 17, slight delays (under 10 minutes): A38 westbound, Wobbly Wheel to Peartree mobile lane closures for safety barrier inspections.

A38, from 8pm November 21 to 6am November 23, slight delays (under 10 minutes): A38 both directions Ashburton to Combe Cross - lane closures for signs - erection.

National Highways is responsible for maintaining motorways and major A-roads, so closures of smaller roads will not be included in their schedule.